eTaskMaker Module Updates for March
InterPlan Systems has released the following new and updated eTaskMaker estimating modules:
- Blind Installation Detailed – (new) Allows for the creation of a single Blind installation estimate, by specifying the size, rating or thickness, and whether scaffolding and/or a crane and/or SCBA are required for breaking the flange and installing the blind.
- Drum Erection – (new) For installing a new drum.
- Heat Exchanger Erection – (new) For installing a new heat exchanger.
- Tower – Product Stripper (Rev. 3) – (updated) Enhanced estimating formulas for crew assignments on blinding activities.
- Unit Start-Up Milestones (Rev. 2) – (updated) Improved scheduling logic.
eTaskMaker clients may now download the updates from our downloads repository.