eTaskMaker Module Updates for July
InterPlan Systems has released the following new and updated eTaskMaker estimating modules:
- Blind Installation Detailed (Rev. 1) – (updated) This revision now allows for the preparation of a work order estimate and plan that can include scopes for the following options:
- Selection of craft labor
- Installation of scaffolding (if necessary)
- Use of a crane (if necessary)
- Use of SCBA (fresh air safety equipment) (if necessary)
- Specify blind size, rating, thickness
- Prepare a single, global scope for multiple blinds
- Prepare individually defined blind installations
- Heat Exchangers – Fixed Tubesheet (Rev. 12) – (updated) Three modifications:
- allows for specifying the number of bolts to be removed / cleaned / inspected / replaced
- includes tasks for modifying the scaffold to allow for the removal/reinsertion of the tube bundle
- removes the option for removing/replacing the entire exchanger. A new module was created for this purpose, that offers improved estimating depth
- Heat Exchangers – U-Tubes (Rev. 19) – (updated) Three modifications:
- allows for specifying the number of bolts to be removed / cleaned / inspected / replaced
- includes tasks for modifying the scaffold to allow for the removal/reinsertion of the tube bundle
- removes the option for removing/replacing the entire exchanger. A new module was created for this purpose, that offers improved estimating depth
- Heat Exchanger Replacement – (new) Contains tasks for the removal of an existing heat exchanger and installing a new one in its place. There is an option to modify the foundation for the new exchanger, if required. This module replaces previous exchanger replacement tasks embedded in maintenance modules.
eTaskMaker clients may now download the updates from our downloads repository.