InterPlan Systems has released the following updated and new eTaskMaker estimating modules:

  • Blind Installation (Rev. 10)(updated) Major revision includes overhaul of scheduling logic, plus the ability to specify multiple blinding locations at a particular job site (such as a tower, vessel, etc.)
  • Drums (Rev. 17)(updated) Improved estimating formulas for heat stress adjustments.
  • Heat Exchangers – Double Pipe (Rev. 9)(updated) Now provides option for installing blinds with SCBA.
  • Heat Exchangers – Floating Head (Rev. 15)(updated) Now provides option for installing blinds with SCBA.
  • Heat Exchangers – U-Tubes (Rev. 21)(updated) Now provides option for installing blinds with SCBA and improved scheduling logic.
  • Motor Operated Valves (M.O.V.s) (Rev. 8)(updated) Now allows for the preparation of estimates / plans for the removal and servicing the actuator and the entire valve. Three types of valves are included: butterfly, globe or block. Actuators can be hydraulic, pneumatic or electric.
  • Pipe – Field Erection (Rev. 14)(updated) Improved estimating formulas and scheduling logic.
  • Pipe – Shop Fabrication (Rev. 7)(updated) Improved estimating formulas and scheduling logic.
  • Tanks (Rev. 11)(updated) Now provides option for installing blinds with SCBA.

eTaskMaker clients may now download the updates from our downloads repository.