InterPlan Systems News


eTaskMaker Module Updates for June

InterPlan Systems has released the following updated and new eTaskMaker estimating modules:

  • Drum Corrosion Remediation(new) Allows for remediating corrosion problem that usually occur on a drum or tank wall as a result of condensation accumulation under insulation.
  • Heat Exchangers – U-Tubes (Rev. 24)(updated) Now includes an option to bake out the tube bundle at an outside shop after cleaning it. It also allows to specify if the cleaning method is tube by tube or if several tubes can be cleaned simultaneously.
  • Piping Corrosion Remediation(new) Allows for removing insulation, inspecting, sandblasting or wirewheel cleaning corrosion areas on piping, applying a protective coating and re-insulating.

eTaskMaker clients may now download the updates from our downloads repository.