eTaskMaker Module Updates for November

InterPlan Systems has released the following updated eTaskMaker estimating modules:

  • Block Valves – Bolted (Rev. 24)(updated) Includes some enhancements to estimating formulas and schedule logic. Also incorporates a safety permit and allows for the specification of different types of insulation.
  • Block Valves – Welded (Rev. 23)(updated) Incorporates a safety permit and allows for the specification of different types of insulation.
  • Check Valves (Rev. 5)(updated) Includes some enhancements to estimating formulas and schedule logic. Also incorporates a safety permit and allows for the specification of different types of insulation. Improvements were introduced with assistance of Mr. Joe Hossack, Suncor Energy.
  • Heat Exchangers – Fixed Tubesheet (Rev. 15)(updated) Minor improvements with the bolt inspection tasks.
  • Heat Exchangers – Floating Heads (Rev. 16)(updated) Minor improvements with the bolt inspection tasks.
  • Heat Exchangers – U-Tubes (Rev. 26)(updated) Minor improvements with the bolt inspection tasks.
  • Heat Exchangers – Vertical (Rev. 15)(updated) Minor improvements with the bolt inspection tasks.
  • Pipe – Small Diameter Welded – Field Erection (Rev. 2)(updated) Improved estimating formulas and schedule logic.
  • Unit Blinds (Rev. 1)(updated) Improved estimating formulas and schedule logic.

eTaskMaker clients may now download the updates from our downloads repository.