eTaskMaker Module Updates for March

InterPlan Systems has released the following updated eTaskMaker estimating modules:

  • Air Coolers (Rev. 10)(updated) Improved estimating formulas.
  • Asbestos Abatement (Rev. 9)(updated) Improved estimating formulas.
  • Blind Installation (Rev. 12)(updated) Improved estimating formulas.
  • Block Valves – Bolted (Rev. 25)(updated) Improved schedule logic.
  • Butterfly Valves (Rev. 11)(updated) Includes some enhancements to estimating formulas and allows for the specification of different types of insulation.
  • Chain Operators (Rev. 5)(updated) Improved schedule logic.
  • Check Valves (Rev. 7)(updated) Improved schedule logic.
  • Control Valves (Rev. 18)(updated) Improved estimating formulas.
  • Cooling Tower Gear Boxes – Fans (Rev. 4)(updated) Improved task logic flow.
  • Crude Furnace (Rev. 7)(updated) Improved estimating formula and schedule logic.
  • Deaerator (Rev. 7)(updated) Improved estimating formulas.
  • Drum Demolition (Rev. 4)(updated) A major revision, incorporating many different scenarios involving different types of insulation removal, vessel safing, and rigging options.
  • Drum Erection – New (Rev. 5)(updated) Improved estimating formulas and schedule logic.
  • Drums (Rev. 19)(updated) Improved estimating formulas and also now includes an option to blank off flanges with Strahman/Onis type inline blanking devices that require only one operator and 3 minutes to blind off any line.
  • Electronic Transmitters – Field Service (new) Developed with the assistance of Mr. Greg Dennison, with the DuPont Sabine River Works.
  • Flanges – BM (Rev. 9)(updated) Improved schedule logic.
  • Flanges – PF (Rev. 9)(updated) Improved schedule logic.
  • Flare – In Situ (Rev. 5)(updated) Improved task detail and now includes option to replace thermocouple(s).
  • Flare – Shop Repairs (Rev. 3)(updated) Improved definition for blinding tasks.
  • Foundation – Concrete (Rev. 12)(updated) Improved schedule logic.
  • Four Stage Piston Compressor (Rev. 1)(updated) Added tasks for valve removal and transport.
  • Furnace – Open and Close (Rev. 6)(updated) Improved schedule logic.
  • Heat Exchanger Bundle Retubing (Rev. 3)(updated) Improved estimating formulas and schedule logic.
  • Install Conduit and Pull Cable 2in. and Higher (Rev. 1)(updated) Now includes tasks for installation of underground conduit.
  • Install Conduit and Pull Cable Up To 1.5in.(Rev. 1)(updated) Now includes tasks for installation of underground conduit.
  • Motor Operated Valves (M.O.V.s) (Rev. 13)(updated) Improved estimating formulas and now allows for the tasks involved in asbestos abatement.
  • Pipe – Shop Fabrication (Rev. 9)(updated) Improved estimating formulas.
  • Pipe – Small Diameter Welded – Field Erection (Rev. 3)(updated) Improved schedule logic.
  • Pumps – Centrifugal (Rev. 14)(updated) Improved detail for pump reassembly and now incorporates additional options for three types of insulation removal and installation.
  • Rotary Screw Compressor(new) Allows for the preparation of estimates / plans to open, disassemble, clean and inspect rotary screw type compressors.
  • Tanks (Rev. 14)(updated) Improved estimating formulas and now incorporates tasks and estimates for repairing a tank by installing a vinyl liner and concrete layer over a damaged/leaky floor.
  • Unit Blinds (Rev. 2)(updated) Improved estimating formulas.

eTaskMaker clients may now download the updates from our downloads repository.