New eTaskMaker Module
InterPlan Systems has released the following new eTaskMaker estimating module:
- Heat Exchangers – Steam Sparged Water Bath Vaporizer – (new) This heat exchanger module is based on the Linde lox backup vaporizer design, that consists of a U-tube exchanger with a second bundle that consists of three u-tube (hairpin) tubes.
eTaskMaker clients may now download the update from our downloads repository.