eTaskMaker Module Updates for May
InterPlan Systems has released the following updated eTaskMaker estimating modules:
- Fired Heater Tubes Decoking (Rev. 2) – (updated) Added scenario for using pigging method (in addition to the existing scenario for steam air decoking).
- Fired Heater Tubes – Stuck Pig Retrieval – (new) When it is not possible to dislodge a stuck pig through hydraulic action, it can be necessary to cut the tube to retrieve it.
eTaskMaker clients may now download the updates from our downloads repository.