eTaskMaker Module Updates for May

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Heat Exchangers – U-Tubes (Rev. 18) – (updated) Improved schedule logic. Pipe – Field Erection (Rev. 12) – (updated) Adjusted estimating factors for the installation of metal jacketing on insulation. Pipe Spools (Bolted) – Field Erection – (new) Allows for the creation of […]

Update for eTaskMaker Wizard

InterPlan Systems has released an update for the eTaskMaker Wizard that includes the ability to edit estimates prior to export. eTaskMaker clients may now download the update from our downloads repository. Clients with an Enterprise license should contact InterPlan Systems for customized updates. The eTaskMaker demo has also been updated with the latest version of […]

eTaskMaker Module Updates for December

Many eTaskMaker estimating modules created and/or revised for this update contain productivity adjustment factors. There are now four (4) different kind of productivity (loss) adjustments possible: UNIT ENVIRONMENTAL HAZARD CONDITIONS – Productivity adjustments can be made for work in a process unit where environmental hazard conditions require extreme safety measures such as the wearing of […]

eTaskMaker Module Updates for October

Many eTaskMaker estimating modules created and/or revised for this update contain productivity adjustment factors. There are now four (4) different kind of productivity (loss) adjustments possible: UNIT ENVIRONMENTAL HAZARD CONDITIONS – Productivity adjustments can be made for work in a process unit where environmental hazard conditions require extreme safety measures such as the wearing of […]

eTaskMaker Module Updates for September

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Equipment Procurement – Fabricated – (new) This module is for the sizing, specification, procurement, fabrication and delivery of fabricated equipment such as vessels and drums. Users must review all durations and update to current delivery conditions. Equipment Procurement – Rotating Equipment – (new) […]

eTaskMaker Module Updates for August

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: AG Centrifugal Pump Installation (Rev. 2) – (updated) Now includes better definition of pump size, plus installation of heat tracing and insulation. Foundation – Concrete (Rev. 10) – (updated) Provides for better definition of forms materials (lumber, plywood or cardboard type). Pipe – […]

eTaskMaker Module Updates for July

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Air Coolers (Rev. 6) – (updated) Now includes an option to clean the tubes with the Hydrokinetics sonic cleaning method (you can still choose the traditional high pressure water lancing if preferred). Block Valves – Bolted (Rev. 15) – (updated) Now includes tasks […]

eTaskMaker Module Updates for May

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Clarifier (Central Drive-Bridge Type) – (new) Pump out, inspect and repair diverse parts of a clarifier of the central bridge type. Drum Demolition – (new) Allows for the demolition of an existing Drum (including tasks for neutralizing/decontamination as well as for chemical cleaning […]

eTaskMaker Module Updates for March

InterPlan Systems has released the following new and updated eTaskMaker estimating modules: Blind Installation Detailed – (new) Allows for the creation of a single Blind installation estimate, by specifying the size, rating or thickness, and whether scaffolding and/or a crane and/or SCBA are required for breaking the flange and installing the blind. Drum Erection – […]