InterPlan Systems News


Archive for the 'Updates Log' Category

eTaskMaker Module Updates for February

InterPlan Systems has released the following updated eTaskMaker estimating modules: HFO Storage Tank & Steam Heating Coil – (new) Covers draining the tank, cleaning it out, inspecting it, and replacing the heating coil. Pipe Rack Fabrication and Erection – (new) Covers fabrication, erection and fireproofing of structural steel pipe racks – single, double or triple […]

New eTaskMaker export for Primavera P5 and P6

InterPlan Systems has released an update for the eTaskMaker Wizard that includes an export facility for Primavera Systems’ P5 and P6 scheduling software. eTaskMaker clients may now download the update from our downloads repository.

eTaskMaker Module Updates for November

InterPlan Systems has released the following updated eTaskMaker estimating modules: Tower – Vacuum Flasher (Rev. 3) – (updated) Fixed error in formulas for duration of blinding tasks. Heat Exchangers – U-Tubes (Rev. 13) – (updated) Enhancement covers adding repair severity parameter for the heat exchanger shell (minor, average, major, extensive repairs). Heat Exchangers – Fixed […]

eTaskMaker Module Updates for October

InterPlan Systems has released the following updated eTaskMaker estimating modules: Control Valves (Rev. 10) – (updated) Includes tasks for decontaminating and servicing the valve at an outside vendor shop. UHP Water Jet Cutting – (new) Covers mobilization, demobilization and cutting of metal plate (floor plates, walls, etc.). eTaskMaker clients may now download the updates from […]

eTaskMaker Module Updates for August

InterPlan Systems has released the following updated eTaskMaker estimating modules: Conveyors – Open Belt (Rev. 3) – (updated) Includes better task definition and improved estimating formulas. FWH Replacement Planning – (new) Estimates the cost and schedule for planning the replacement of a FWH boiler. Pipe Insulation – Calcium Silicate (Rev. 2) – (updated) Improved estimating […]

eTaskMaker Module Updates for March

InterPlan Systems has released the following updated eTaskMaker estimating modules: Agitators (Rev. 5) – (updated) Updated estimating formulas for scaffolding. Air Coolers (Rev. 5) – (updated) Updated estimating formulas for scaffolding. Asbestos Abatement (Rev. 7) – (updated) Updated estimating formulas for scaffolding. Blind Installation (Rev. 6) – (updated) Updated estimating formulas for scaffolding. Block Valves […]

ATC Professional Update Available

A new update for ATC Professional is now available from the the client download repository that includes a minor bug fix and enhanced error handling for the work order logic template display.

eTaskMaker Module Update for November

InterPlan Systems has released the following new eTaskMaker estimating module (for marine/ship repair): HFO Storage Tank & Steam Heating Coil – (new) Allows for the cleaning and inspection of the tank and replacement of the steam heating coil. eTaskMaker clients may now download the updates from our downloads repository.

eTaskMaker Module Updates for September

InterPlan Systems has released the following updated eTaskMaker estimating modules: Pipe – Field Erection (Rev. 8) – (updated) Minor update to the estimating formula(s). Unit Start-Up Milestones – (new) This modules provides convenient milestones for the start-up sequence of a plant unit or for a plant. Different unit systems are identified, which provide logical connection […]

eTaskMaker software update available

We have posted updates for the eTaskMaker Wizard and Module Editor to the eTaskMaker software downloads repository. eTaskMaker clients may now log in to the download area and download the update. The release addresses several issues with the eTaskMaker Module Editor and a text file with release notes is included in the distribution.